Det­ta­glio del pro­get­to ed. 2024

ban­­po-church / South Korea

Don­g­kyu Choi

Pro­get­ti­sta Don­g­kyu Choi
Loca­tion Seoul
Nazio­ne South Korea
Desi­gn Team
Anno 2015
Cre­di­ti Fotografici

Foto ester­ni

Descri­zio­ne del progetto

The pro­gram reque­sted by the client was lar­ger than what could be accom­mo­da­ted on the cur­rent site. To address this, the spa­ces for even­ts at the com­mu­ni­ty cen­ter, cal­led the church, were stac­ked ver­ti­cal­ly in layers.
The clien­t’s reque­sted spa­ce pro­gram resul­ted in a squa­re for­mal volu­me, with squa­re cube boxes stac­ked on top of each other. The lar­ge­st spa­ce, the main cha­pel, occu­pies the third and fourth floors, whi­le pro­grams such as a cafe­te­ria and com­pa­ny resi­den­ce are abo­ve it. A book café, edu­ca­tio­nal spa­ce, and gym­na­sium are stac­ked abo­ve these.
Our desi­gn con­cept twi­sted the stac­ked cubes slightly to sof­ten the rigid box sha­pe and crea­ted stair­ca­ses and path­ways for light to pass throu­gh the cracks and cre­vi­ces of the twi­sted mass. The­se paths and stairs esta­bli­shed visual and phy­si­cal con­nec­tions bet­ween other­wi­se discon­nec­ted spa­ces. The cei­lings on both sides of the main hall allo­wed light to pour down throu­gh sky­lights. Addi­tio­nal­ly, the cafe­te­ria abo­ve the main cha­pel and the com­pa­ny resi­den­ce were plan­ned to con­nect to the exter­nal deck and stairs.
The exter­nal cube over­laps the two layers of the shell, and the spa­ce bet­ween the two shells is ope­ned to reveal the entran­ce and gate at the front. The tem­po­ra­ry wall at the front was rai­sed to its highe­st height to ser­ve as a bell tower whe­re a cross could be pla­ced. A fra­­me-type ope­ning was inclu­ded in the tem­po­ra­ry wall to enhan­ce the pre­sen­ce of the cross, with the cross posi­tio­ned within the fra­me. Seve­ral small win­do­ws were added to the over­lap­ping tem­po­ra­ry walls to allow light into the inte­rior spa­ce during the day. At night, light pro­jec­ts throu­gh the­se windows.
A sun­ken spa­ce con­nec­ts the ground level to the second base­ment level, pro­vi­ding natu­ral lighting to the under­ground edu­ca­tio­nal spa­ce, with stairs natu­ral­ly con­nec­ting the­se levels vertically.

Rela­zio­ne illu­stra­ti­va del progetto
Sca­ri­ca la relazione

Foto inter­ni

Dise­gni tecnici